CASE STUDY 03
Material Recovery, Classification & Cost Avoidance
THE PROBLEM
Material Recovery, Classification & Cost Avoidance
Over 1,000 pallets of unverified production components were at risk of full disposal due to lack of identification and quality uncertainty.
THE SCENARIO
What we walked into
- Large-scale component inventory (plastic, glass, metal)
- No labeling, tracking, or system visibility
- Exposure to outdoor conditions
- Initial plan: dispose of entire inventory
HOW WE HELPED
What BIG HOUSE EXPRESS did
- Pallet-by-pallet identification and material classification
- Segregation by SKU and material type (HDPE, PET, etc.)
- Quality assessment for production reuse
- Inventory restructuring for visibility and usability
- Developed recycling program with local partner
- Led full project execution and disposition strategy
THE RESULTS
From Write-Off Risk → 80% Inventory Recovery
80%
Material recovered
from 0% usable
$120K
Cost avoided
~$70K–$120K saved
100%
Pallets classified
across ~1,000 pallets
- Remaining materials responsibly recycled — zero landfill reliance
- Restored full visibility into inventory position
- Demonstrated value beyond traditional 3PL scope
More case studies
CASE STUDY 01Read case study
Inventory Recovery & Fulfillment Stabilization
Severely mismanaged inventory led to inaccurate counts, incorrect shipments, and high risk of product expiration.
40% inventory accuracy → 99% inventory accuracy
CASE STUDY 02Read case study
Go-To-Market Launch & Fulfillment
An emerging beauty brand required full operational infrastructure to launch into retail and direct-to-consumer channels.
2–4 → 20+
SKUs — 10× growth
CASE STUDY 04Read case study
Large-Scale Deployment & White-Glove Execution
Time-sensitive furnishing of residential units required rapid coordination, organization, delivery, and installation following wildfire displacement.
2,500
Items installed
Ready to Transform Your Logistics Operations?
Founder-led service. Six Sigma discipline. Response within one business day.
